Click Photos To Enlarge
The deluge began after the BNSF Railway (BNSF) eastbound 2+2 autoracks train arrived in Maine, AZ, on Tuesday, June 25, 2024. The storm was accompanied by a lot of nearby lightning and thunder. The autoracks train had BNSF 3805, 7296 + 1119, 4696 for power.
BNSF 3805 is a GE ET44C4, Tier 4 GEVO. Reportedly it was built in 2016, builders number 64056.
--
Nikon D750, 24~120mm f4 lens,
Images: 2024.7.1.1.72, 80, 82-ph
No comments:
Post a Comment